Felton Library Project

4 Documents in Project

Summary

SCH Number
2017092047
Lead Agency
Santa Cruz County
Document Title
Felton Library Project
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2018
Present Land Use
Z: R-1-10 GP: R-UL

Document Description
The project proposes to construct a library and an outdoor interactive environmental education program in two phases. Phase one would consist of the construction of a 9,657 sf library with a fenced patio, parking lot, frontage improvements along Gushee St, a monument sign, and related improvements; the replacement of a culvert in Bull Creek with pedestrian bridge, and restoration of the riparian area. Phase two would consist of the construction of outdoor interactive environmental education areas and a second pedestrian bridge over Bull Creek.

Contact Information
Kathleen Molloy Previsich
Santa Cruz County
701 Ocean Street 4th Floor
Santa Cruz, CA 95060

Phone : (831) 454-2580

Location

Coordinates
37°02'59.6"N 122°04'28.5"W
Counties
Santa Cruz
Cross Streets
Gushee St and Hihn St
Zip
95018
Total Acres
15.3
Parcel #
065-073-03, 065-281-03
State Highways
9
Railways
Roaring Camp RR
Schools
San Lorenzo Valley HS; St. Lawrence Acad; Mt. Hermon Play
Waterways
Bull Creek, San Lorenzo River, Zayante Creek, Bean Creek
Township
10S
Range
2W
Section
22
Base
MDBM
Other Location Info
Felton

Notice of Determination

Approving Agency
County of Santa Cruz
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
701 Ocean St., 4th Floor, Santa Cruz, CA 95060

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search