Felton Library Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017092047
- Lead Agency
- Santa Cruz County
- Document Title
- Felton Library Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/13/2018
- Present Land Use
- Z: R-1-10 GP: R-UL
- Document Description
- The project proposes to construct a library and an outdoor interactive environmental education program in two phases. Phase one would consist of the construction of a 9,657 sf library with a fenced patio, parking lot, frontage improvements along Gushee St, a monument sign, and related improvements; the replacement of a culvert in Bull Creek with pedestrian bridge, and restoration of the riparian area. Phase two would consist of the construction of outdoor interactive environmental education areas and a second pedestrian bridge over Bull Creek.
- Contact Information
-
Kathleen Molloy Previsich
Santa Cruz County
Lead/Public Agency
701 Ocean Street 4th Floor
Santa Cruz, CA 95060
Phone : (831) 454-2580
Location
- Coordinates
- 37°02'59.6"N 122°04'28.5"W
- Counties
- Santa Cruz
- Cross Streets
- Gushee St and Hihn St
- Zip
- 95018
- Total Acres
- 15.3
- Parcel #
- 065-073-03, 065-281-03
- State Highways
- 9
- Railways
- Roaring Camp RR
- Schools
- San Lorenzo Valley HS; St. Lawrence Acad; Mt. Hermon Play
- Waterways
- Bull Creek, San Lorenzo River, Zayante Creek, Bean Creek
- Township
- 10S
- Range
- 2W
- Section
- 22
- Base
- MDBM
- Other Location Info
- Felton
Notice of Determination
- Approving Agency
- County of Santa Cruz
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 701 Ocean St., 4th Floor, Santa Cruz, CA 95060
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.