Rancho Seco Solar II Project

9 Documents in Project

Summary

SCH Number
2017092042
Lead Agency
Sacramento Municipal Utility District
Document Title
Rancho Seco Solar II Project
Document Type
NOD - Notice of Determination
Received
Posted
10/18/2018
Present Land Use
LU: Public & Quasi-public; Zoning: Permanent Agriculture, 80-acre minimum (AG-80)
Document Description
SMUD would lease land to a third party to build and operate a PV solar power facility (up to 152 MW). The project includes installation of PV solar modules, foundation piles, racking, direct current collection, alternating current collection, inverters, medium voltage transformers, high voltage substation, switchgear, battery storage, and interconnection to the existing SMUD transmission project. An existing solar site would be decommissioned and the site would be reused. Construction would take approx. 13 months, would begin in 2019, and conclude in 2020. At the end of the project's useful life (30-35+ years), the site would be decommissioned.

Contact Information

Name
Emily Bacchini
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Twin Cities Road and lay East Road
Zip
95638
Total Acres
554
Parcel #
140-0050-008, 0011, 0010, 0013
State Highways
104
Railways
UPPR
Waterways
Browns, Hadselville, Skunk, and Griffith Creeks
Township
6N
Range
8E
Section
29
Base
MD

Notice of Determination

Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.