Baylands Boardwalk Improvement Project

2 Documents in Project

Summary

SCH Number
2017092038
Lead Agency
Palo Alto, City of (City of Palo Alto)
Document Title
Baylands Boardwalk Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/30/2017
Present Land Use
Z: Site and design overlay, GP: PF

Document Description
The project proposes the replacement of the existing Palo Alto Baylands boardwalk with a new, improved boardwalk along the same alignment of the existing boardwalk. The existing timber boardwalk extends approx 850 ft northeast across the Harriet Mundy Marsh towards the SF Bay from the Interpretive Center and the San Francisquito Creek Trail. The new boardwalk would be five ft in width intermittent viewing platforms and its elevation would be 3.6 to 4.3 ft higher than the existing structure to accommodate projected sea-level rise.

Contact Information
Elizabeth Ames
City of Palo Alto
250 Hamilton Avenue, 6th Floor
Palo Alto, CA 94301

Phone : (650) 329-2502

Location

Coordinates
37°27'34.6"N 122°06'22.7"W
Cities
Palo Alto
Counties
Santa Clara
Cross Streets
Embarcadero Rd, at the San Francisquito Creek trail
Zip
94303
Total Acres
0.1
Parcel #
008-06-001
State Highways
101
Airports
Palo Alto Airport
Schools
Duveneck ES
Waterways
Harriet Mundy Marsh, Mayfield Slough

Notice of Determination

Approving Agency
City of Palo Alto
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
250 Hamilton Ave., 6th Floor, Palo Alto, CA 94301

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.