CA FLAP SCR T5(1&2) - North Coast Rail Trail (Lake or Streambed Alteration Agreement No. EPIMS-SCR-31309-R3)

6 Documents in Project

Summary

SCH Number
2017092034
Lead Agency
Santa Cruz County Regional Transportation Commission
Document Title
CA FLAP SCR T5(1&2) - North Coast Rail Trail (Lake or Streambed Alteration Agreement No. EPIMS-SCR-31309-R3)
Document Type
NOD - Notice of Determination
Received
Posted
10/2/2023
Document Description
The Project is limited to the installation of five culverts within five ephemeral streams as part of the North Coast Rail Trail. Culvert installation at all locations will involve clearing and grubbing vegetation, prepping the stream channel, culvert installation, culvert backfill, flared end section installation, riprap apron installation, installation of trail base material over the backfill, and paving the trail over the culvert. Work will be conducted when the stream channel is dry and there will be no dewatering at any site.

Contact Information

Name
Serena Stump
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Unincorporated area
Counties
Santa Cruz
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project includes 5 project locations, located at multiple unnamed tributaries to the Pacific Ocean accessed along a rail corridor connecting Davenport to Wilder Ranch State Park, in the County of Santa Cruz, State of California. Location 1: Latitude 37.00820, Longitude -122.19007; Assessor’s Parcel Number [APN] 058-121-03. Location 2: Latitude 36.98113, Longitude -122.14258; APN 059-023-10. Location 3: Latitude 36.97834, Longitude -122.13680; APN 059-023-10. Location 4: Latitude 36.96439, Longitude -122.11247; APN 059-131-08. Location 5: Latitude 36.95996, Longitude -122.09199; APN 059-141-05.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print