Environmental Impact Report No. 7257 Fifth Standard Solar Project Complex
3 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2017091038
- Lead Agency
- Fresno County
- Document Title
- Environmental Impact Report No. 7257 Fifth Standard Solar Project Complex
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/10/2020
- Project Applicant
- RWE Solar Development, LLC
- Present Land Use
- Fallow land
- Document Description
- Environmental Impact Report No. 7257 for the Fifth Standard Solar Project Complex permitted by Conditional Use permits 3562, 3563, and 3564. Which allows the construction, operation, maintenance, and ultimate decommissioning of a 150-megawatt (MW) solar photovoltaic (PV) generation facility, an up to 20-MW solar PV generation facility, and an up to 100-MW energy storage facility and associated infrastructure. The proposed project is located on twelve contiguous parcels, totaling approximately 1,600 acres in unincorporated Fresno County. A new generation-tie (gen-tie) line would be constructed to connect the solar and storage components of the proposed project to Pacific Gas and Electric’s (PG&E’s) adjacent Gates Substation (point of interconnect). The anticipated lifetime of the proposed project would be 35 years and would be decommissioned once operations of the facility cease.
- Contact Information
-
David Randall
County Of Fresno
2220Tulare Street Suite A, Street Level
Fresno, CA 93721
Phone : (559) 600-4052
drandall@Fresnocountyca.gov
Location
- Counties
- Fresno
- Cross Streets
- west side of State Route 269 (Lassen Avenue), between Gale Avenue and Jayne Avenue
- Parcel #
- APNs: 075-060-15s, 075-060-52s, 075-070-01s, 075-070-32s, 075-070-33s, 075-070-34s, 075-070-35s,
- State Highways
- SR 269
- Township
- 20S
- Range
- 17E
- Section
- 27
- Base
- MDBM
Notice of Determination
- Approving Agency
- County of fresno
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 220 Tulare Street, Suite A Street Level, Fresno CA 93721
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- drandall_201110-F&G Fee Receipt (TR) PDF 113 K drandall_201110-NOD With Clerk Stamp (TR) PDF 117 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.