Alamitos Beach Concession Rebuild Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017091025
- Lead Agency
- Long Beach, City of (City of Long Beach)
- Document Title
- Alamitos Beach Concession Rebuild Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/4/2017
- Present Land Use
- Z: P LUD No. 11 - open space and park district
- Document Description
- The proposed project includes the redevelopment of the existing concession stand and cafe on the project site with three buildings ( a concession stand/care building, a restroom and storage building, and a recreational equipment building). Additional project components include an outdoor recreational area improvements to the existing parking lot, and the addition of a bike lane would reposition a sharp curve in the existing alignment. The project would be aligned with the existing pedestrian and bicycle paths east of the site.
- Contact Information
-
Christopher Koontz
City of Long Beach
333 W. Ocean Boulevard, 5th floor
Long Beach, CA 90802
Phone : (562) 570-6288
Location
- Coordinates
- 33°45'52.3"N 118°10'57.7"W
- Cities
- Long Beach
- Counties
- Los Angeles
- Cross Streets
- East Shoreline Dr and Beach Access Rd
- Zip
- 90803
- Total Acres
- 1.22
- Parcel #
- 7265-021-901
- State Highways
- SR 1
- Railways
- Pacific Harbor Line,
- Schools
- Cesar Chavez ES, Edison
- Waterways
- Alamitos Bay, Queensway Bay
Notice of Determination
- Approving Agency
- City of Long Beach
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 333 West Ocean Blvd., 5th Floor, Long Beach, CA 90802
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.