Phase 2 Biomethane for Waste Management Refueling (Rialto Bioenergy Facility, San Bernardino County)

3 Documents in Project

Summary

SCH Number
2017091011
Lead Agency
Rialto, City of (City of Rialto)
Document Title
Phase 2 Biomethane for Waste Management Refueling (Rialto Bioenergy Facility, San Bernardino County)
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2019
Project Applicant
Rialto Bioenergy Facility LLC

Document Description
This project is to upgrade the biogas produced in Rialto Bioenergy Facility into 960,000 standard cubic feet (scf) per day of renewable natural gas (RNG) to refuel Waste Mangement in great Los Angels area. When fully operational, the upgraded facility will convert food waste and biosolids, diverted from landfills in the greater Los Angeles region, into 2.5 million diesel gallon equivalents of biomethane transportation fuel. The proposed fuel will have a carbon intensity of -187gCO2e/MJ and will eliminate 97,158 metric tons of carbon emissions annually from transportation fuel.

Contact Information
Taiyang Zhang
California Energy Commission
1516 Ninth Street
Sacramento, CA 95814

Phone : (916) 653-1195

Location

Cities
Rialto
Counties
San Bernardino
Cross Streets
503 East Santa Ana Avenue, Rialto, CA 92376

Notice of Determination

Approving Agency
California Energy Commission
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
https://www.energy.ca.gov/contracts/arv-18-029/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2017091011   PDF 706 K
Download CSV New Search