Oso Flaco Lake Culvert Replacement

2 Documents in Project

Summary

SCH Number
2017091008
Lead Agency
California Department of Parks and Recreation
Document Title
Oso Flaco Lake Culvert Replacement
Document Type
NOD - Notice of Determination
Received
Posted
10/9/2017
Present Land Use
state vehicular recreation area
Document Description
The OHMVR Division evaluated the potential environmental effects of installing two permanent culverts under the Oso Flaco Lake causeway at the Oceano Dunes State Vehicular Recreation Area. The proposed project would remove and replace the two existing culverts transecting the Oso Flaco Lake Road causeway. The work involves excavating the width of a 20-ft long section of the causeway to remove the culverts and install two 30-ft long, 48-in diameter culverts beneath the causeway roadbed. Once installed, the excavated area would be backfilled with new base material, approx 104 cy of crushed red rock. Total disturbance area is 0.002 acres.

Contact Information

Name
Dena Bellman
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo
Cross Streets
Oso Flaco Rd and SR 1
Zip
93433
Total Acres
<0.1
Parcel #
various
State Highways
1
Railways
Amtrak
Airports
Oceano County
Schools
Oceano ES
Waterways
Oso Flaco Creek, Oso Flaco Lake
Township
12N
Range
36W
Section
35
Other Location Info
Oceano

Notice of Determination

Approving Agency
CA Dept. of Parks and Rec., OHMVR Division
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print