Bridgeway Lakes Drainage Pipeline Project

2 Documents in Project

Summary

SCH Number
2017082090
Lead Agency
Reclamation District No. 900 (Reclamation Distirct No. 900)
Document Title
Bridgeway Lakes Drainage Pipeline Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project will involve construction of a stormwater drain pipeline extending from the stormwater detention basin in the north of the project area, approx.. 11,700 feet to the south. The construction will take place parallel to the existing Bridgeway Lakes Drainage Ditch. Construction of the pipeline will avoid impacts to seasonal habitats while providing efficient stormwater and flood protection.

Contact Information
Toby Wong
West Sacramento Area Flood Control Agency
1110 West Capitol Avenue
West Sacramento, CA 95691

916-617-4645

Location

Coordinates
38°32'06"N 121°34'53"W
Cities
West Sacramento
Counties
Yolo
Cross Streets
Marshall Rd and Bridgeway Lakes Drainage Ditch
Zip
95691
Total Acres
13.4
Parcel #
multiple
Schools
Bridgeway Island ES
Waterways
Sacramento Deep Water Channel
Township
8N
Range
4E
Base
MDBM

Notice of Determination

Approving Agency
West Sacramento Area Flood Control Agency
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1110 West Capitol Ave., West Sacramento, CA 95691

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search