Lime Kiln Road Bridge Replacement over Curtis Creek - (Bridge No. 32C0016)

2 Documents in Project

Summary

SCH Number
2017082071
Lead Agency
Tuolumne County
Document Title
Lime Kiln Road Bridge Replacement over Curtis Creek - (Bridge No. 32C0016)
Document Type
NOD - Notice of Determination
Received

Document Description
Project would replace the structurally deficient bridge along Lime Kiln Road over Curtis Creek and realign the existing roadway. The existing Lime Kiln Road bridge (Bridge No. 32C0016), which is structurally deficient, will also be removed. The proposed project will accommodate a design speed of 25 mph, will consist of 12 feet lanes with 6 feet shoulders, and 3 ft. unpaved hinges. The realignment of Lime Kiln Road will also include realigning side streets shoulders, and 3 foot unpaved hinges. The realignment of Lime Kiln Road will also include realigning side streets Kennedy Road and Es La Vida Road; these roads will intersect with Lime Kiln Road at 90-degree angles. The proposed bridge will be a three span, cast-in-plae concrete slab supported on pier walls with spread footings.

Contact Information
Blossom Scott-Heim
Tuolumne County
2 South Green Street
Sonora, CA 95370

209-533-5633

Location

Coordinates
37°56'8.93"N 120°21'6.13"W
Counties
Tuolumne
Cross Streets
Lime Kiln Rd at Curtis Creek Overcrossing
Zip
95373
Total Acres
2.1
Parcel #
960202100, 960202700, 960202800
Waterways
Curtis Creek, Sullivan Creek
Township
1N
Range
15E
Section
17
Base
7.5-Quad
Other Location Info
Jamestown

Notice of Determination

Approving Agency
County of Tuolumne
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
48 Yaney Ave., Sonora, CA 95370

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search