Lime Kiln Road Bridge Replacement over Curtis Creek - (Bridge No. 32C0016)

2 Documents in Project

Summary

SCH Number
2017082071
Lead Agency
Tuolumne County
Document Title
Lime Kiln Road Bridge Replacement over Curtis Creek - (Bridge No. 32C0016)
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2018
Present Land Use
Tuolumne County ROW; adjacent properties consist of rural residential and agricultural uses
Document Description
Project would replace the structurally deficient bridge along Lime Kiln Road over Curtis Creek and realign the existing roadway. The existing Lime Kiln Road bridge (Bridge No. 32C0016), which is structurally deficient, will also be removed. The proposed project will accommodate a design speed of 25 mph, will consist of 12 feet lanes with 6 feet shoulders, and 3 ft. unpaved hinges. The realignment of Lime Kiln Road will also include realigning side streets shoulders, and 3 foot unpaved hinges. The realignment of Lime Kiln Road will also include realigning side streets Kennedy Road and Es La Vida Road; these roads will intersect with Lime Kiln Road at 90-degree angles. The proposed bridge will be a three span, cast-in-plae concrete slab supported on pier walls with spread footings.

Contact Information

Name
Blossom Scott-Heim
Agency Name
Tuolumne County
Contact Types
Lead/Public Agency

Location

Counties
Tuolumne
Cross Streets
Lime Kiln Rd at Curtis Creek Overcrossing
Zip
95373
Total Acres
2.1
Parcel #
960202100, 960202700, 960202800
Waterways
Curtis Creek, Sullivan Creek
Township
1N
Range
15E
Section
17
Base
7.5-Quad
Other Location Info
Jamestown

Notice of Determination

Approving Agency
County of Tuolumne
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print