Castlewood Tanks Replacement

4 Documents in Project

Summary

SCH Number
2017082069
Lead Agency
Alameda County Public Works Agency
Document Title
Castlewood Tanks Replacement
Document Type
ADM - Addendum
Received
Present Land Use
residential

Document Description
The Tank Replacement project was evaluated as described in the 2017 MND pursuant to CEQA and adopted by the Alameda County Board of Supervisors. Following adoption of the 2017 MND, plans were finalized that included minor changes of locating one of the tanks uphill on the site originally requiring 9,000 sf grading as described in the 2017 MND to increase by 6,000 sf to 15,000 sf. An overflow discharge pipe extending from the tank site through Castlewood Dr. about 900 ft to discharge at a rock rip-rap outfall on the golf course fairway was added. Also, two off-site staging areas, a 5,000 sf area near the tank site and a 1,200 sf site about 1,500 ft to the east of the tanks were identified as potential temporary staging areas. Only one of the two sites would be used during construction.

Contact Information
Jim Browne
Alameda County Public Works Agency
399 Elmhurst Street
Hayward, CA 94544

Phone : (510) 670-5796

Location

Coordinates
37°37'56"N 121°54'19"W
Cities
Pleasanton
Counties
Alameda
Zip
94566
Total Acres
0.2
Parcel #
946-4391-25-1
State Highways
I-680, SR 84
Railways
UPRR
Schools
Hearst ES
Waterways
Arroyo de la Laguna
Township
3S
Range
1E

Notice of Completion

Review Period Start
Review Period End
Development Type
Water Facilities (tank replacement Type, (2)100K gal MGD)
Local Action
Other Action Other Action: public works
Project Issues
Air Quality Biological Resources Forest Land/Fire Hazard Noise Soil Erosion/Compaction/Grading Vegetation
Reviewing Agencies
Cal Fire California Department of Fish and Wildlife, Bay Delta Region 3 California Department of Parks and Recreation California Department of Transportation, District 4 California Highway Patrol California Native American Heritage Commission California Public Utilities Commission California Regional Water Quality Control Board, San Francisco Bay Region 2 Department of Water Resources Resources Agency State Water Resources Control Board, Division of Drinking Water State Water Resources Control Board, Division of Drinking Water, District 4 State Water Resources Control Board, Divison of Financial Assistance

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print