The SCT/LINK Fueling & Maintenance Facility Project and Mitigated Negative Declaration
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017082068
- Lead Agency
- Galt, City of (City of Galt)
- Document Title
- The SCT/LINK Fueling & Maintenance Facility Project and Mitigated Negative Declaration
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/10/2017
- Present Land Use
- PLU: Public/Quasi public;Z:Public/Quasi public, low density residential; GP: Varies
- Document Description
- The city of Galt is proposing to construct a fueling and maintenance facility to serve the transit bus operations for South County Transit on its existing Corporation Yard Annex site. The project includes demolition of existing structures and development of adjacent APN 150-0112-047, requiring a GP amendment and rezoning. The project's proposed on-site improvements include a maintenance building, administrative offices, fueling facility and fuel farm, wash facility, covered parking for transit vehicles, a parking lot, and equipment storage within three Parks Department "yards". Off-site improvements are anticipated to include a new traffic signal and restriping in Elm Ave. at the site's main entrance. The project would be located on a 3.3-acre site at 550 Elm Ave. in the City of Galt, Sacramento County.
- Contact Information
-
Mark Clarkson
City of Galt
495 Industrial Dr
Galt, CA 95632
Phone : (209) 366-7230
Location
- Coordinates
- 38°15'39.8"N 121°18'21.5"W
- Cities
- Galt
- Counties
- Sacramento
- Cross Streets
- Elm Ave, Poplar Ave
- Zip
- 95632
- Total Acres
- 3.3
- Parcel #
- 150-0056-002, -0112-047
- State Highways
- 99
- Railways
- UPRR
- Schools
- Mult
- Waterways
- Mult
- Township
- 5N
- Range
- 6E
- Section
- 27
Notice of Determination
- Approving Agency
- City of Galt
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 495 Industrial Dr., Galt, CA 95632
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.