A Revisions of Previously Approved Action for a Previously Approved Site Approval Application No. PA-1700045 of Shirley Brocchini

2 Documents in Project

Summary

SCH Number
2017082049
Lead Agency
San Joaquin County
Document Title
A Revisions of Previously Approved Action for a Previously Approved Site Approval Application No. PA-1700045 of Shirley Brocchini
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2017
Present Land Use
Bail Bond Agency/I-L/I/L

Document Description
A Revisions of Previously Approved Action for a Previously Approved Site Approval Application No. PA-1700045 of Shirley Brocchini (c/o City Signs) to modify the Conditions of Approval for sign requirements for a bail bonds facility. The revision is to remove the sign requirements in the Conditions of Approval and apply the current Development Title sign standard requirements for the Limited Industrial (I-L) zone. the property is zoned I-L (Limited Industrial and the General Plan designation is I/L Limited Industrial). The project site is located on the north side of Mathews Road, 240 feet west of El Dorado St., French Camp.

Contact Information
Brittney Hanna
San Joaquin County
1810 East Hazelton Avenue
Stockton, CA 95205

Phone : (209) 468-3120

Location

Counties
San Joaquin
Cross Streets
Matthews Rd, El Dorado St
Parcel #
193-160-27
Railways
UPRR
Airports
Stockton Metro
Schools
French Camp School
Waterways
French Camp Slough
Other Location Info
French Camp

Notice of Determination

Approving Agency
San Joaquin County
Approved On
Final Environmental Document Available at
1810 E. Hazelton Ave., Stockton, Ca 95205

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print