Infiltration Gallery Testing Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017082019
- Lead Agency
- Stanislaus Regional Water Authority
- Document Title
- Infiltration Gallery Testing Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/29/2017
- Present Land Use
- agriculture, TID Infiltration gallery, Fox Grove Regional Park/A-2-40/Ag
- Document Description
- SRWA proposes to test the condition and operation of TID's existing infiltration gallery, construct a wet well, and install temporary pumping facilities to ascertain if it is feasible to proceed with the Surface Water Supply Project, a separate water supply project being considered by SRWA. The proposed project would include excavation of an area to access the infiltration gallery pipes; construction of a wet well and associated facilities adjacent to and connecting with the existing infiltration gallery; air purging and test pumping of the gallery pipes to dislodge sediment; pumping of river water through the gallery and into settling basins to inspect and test infiltration gallery and pump capacity and water quality; and disposal of the water, once any entrained sediment has settled out.
- Contact Information
-
Michael Brinton
Stanislaus Regional Water Authority
156 South Broadway, Suite 270
Turlock, CA 95380
Phone : (209) 538-5758
Location
- Coordinates
- 37°37'1.65"N 120°50'51.7"W
- Cities
- Hughson
- Counties
- Stanislaus
- Cross Streets
- Geer Rd at Tuolumne River, river mile 26
- Total Acres
- ~6
- Parcel #
- 018-003-006, 018-004-012, 013, etc.
- Railways
- BNSF
- Waterways
- Tuolumne River
Notice of Determination
- Approving Agency
- Stanislaus Regional Water Authority
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 156 S. Broadway, Suite 270, Turlock, CA 95380
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.