2150 Greenway Drive Land Division and Rezoning

2 Documents in Project

Summary

SCH Number
2017082009
Lead Agency
City of Woodside
Document Title
2150 Greenway Drive Land Division and Rezoning
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2017
Present Land Use
General Plan Designation: Residential; Zoning; Suburban Residential (SR)
Document Description
The 2150 Greenways Drive Project ("the Project") proposes to demolish the existing structures on-site, including a one-story main residence, an accessory structure (pool cabana), and a swimming pool; divide the existing legal parcel of record (APN: 069-250-080) into two legal parcels (Parcel 1 and 2); and rezone the resulting parcels from one residential zoning district (SR) to another residential zoning district (R-1). The existing property is 1.05 acres (45,666 square feet), and the proposed parcels would each be 0.52 acres (22,833 square feet). This applicant's purpose in applying for the land division and rezoning is to create two parcels that could both support single-family residence and associated accessory structures. No new development is proposed.

Contact Information

Name
Corinne Jones, Assistant Planner
Agency Name
Town of Woodside
Contact Types
Lead/Public Agency

Location

Cities
Woodside
Counties
San Mateo
Cross Streets
Alameda de las Pulgas
Zip
94062
Total Acres
1.05
Parcel #
069-250-080
State Highways
84; Interstate 280
Schools
Woodside High School
Waterways
Redwood Creek and Atherton Creek
Township
6S
Range
W3

Notice of Determination

Approving Agency
Town of Woodside
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print