Master IS/MND Tuolumne Utilities District Ditch Maintenance Activities

5 Documents in Project

Summary

SCH Number
2017082005
Lead Agency
Tuolumne Utilities District
Document Title
Master IS/MND Tuolumne Utilities District Ditch Maintenance Activities
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2017
Present Land Use
Various (multiple parcels countywide)
Document Description
Master environmental document to address ongoing system-wide ditch maintenance activities countywide including reducing water loss (ditch lining), pipe capacity (install and replace), maintain/repair/upgrade existing structures, flow operations, fencing, dams and reservoirs (minor), emergency response, staging areas, erosion control, fill and rip rap, retaining walls, freeboard, leak repair, over drains and underdrains, culverts, remove sediment and vegetation within ditches, flume repair, water quality monitoring equipment installation/upgrade, maintain access roads and related activities.

Contact Information

Name
Erik Johnson, District Engineer
Agency Name
Tuolumne Utilities District
Contact Types
Lead/Public Agency

Location

Cities
Sonora
Counties
Tuolumne
Cross Streets
N/A (countywide)
Zip
countywide
Total Acres
67 mi of ditches
Parcel #
countywide
State Highways
49/108
Railways
Sierra RR
Airports
Columbia
Schools
Columbia College
Waterways
Curtis, Algerine, Powerhouse, Mormon
Base
MDB&M
Other Location Info
Tuolome, Twain Harte, Columbia

Notice of Determination

Approving Agency
Tuolumne Utilities District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print