1510018-016C
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017081068
- Lead Agency
- Rosamond Community Services District
- Document Title
- 1510018-016C
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/12/2020
- Document Description
- The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project proposes to integrate eight water systems into the Rosamond Community Services District’s distribution system to provide potable water that meets applicable state and federal water quality standards. All of these systems have a water distribution system currently supplied by groundwater wells. Arsenic levels for most of the systems are above the Max Contaminant Level of 10 micrograms per liter. High levels of other constituents such as chromium and uranium are also present. Additionally, six of the eight systems contain only one well, and lack reliability of supply if that single well failed. Construction would consist of activities including digging, trenching, and excavation of soil to install various sizes of new pipeline.
- Contact Information
-
Bridget Binning
State Water Resources Control Board
Lead/Public Agency
Division of Financial Assistance 1001 I Street, 16th Floor
Sacramento, CA 95814
Phone : (916) 449-5641
Location
- Cities
- Rosamond
- Counties
- Kern
Notice of Determination
- Approving Agency
- State Water Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- 2017081068_RSCD Arscenic PDF 175 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.