Interim Housing at Charles F. Kettering Elementary School

4 Documents in Project

Summary

SCH Number
2017081044
Lead Agency
Long Beach Unified School District
Document Title
Interim Housing at Charles F. Kettering Elementary School
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2017
Present Land Use
LU: Z: GPD: ES: PD-1, Planning development: institutions/schools
Document Description
Long Beach Unified School District is proposing to use the Charles F. Kettering Elementary School campus as interim housing as it modernizes eight elementary schools. The proposed project consists of the installation and use of interim housing (12 temporary portable buildings), expansion of the existing parking lot, widen two driveways and close one driveway at Kettering ES. The temporary portable buildings are required to house students in grades 3, 4, and 5 during modernization of the following eight schools over the next eight years: Kettering ES, Mann ES, Bixby ES, Fremont ES, Naples ES, Bryant ES, Prisk ES. Campus modernizations at each school would include construction such as, HVAC system installation and boiler system decommissioning, electrical upgrades, ADA facility improvements, ceiling repair, and painting. None of the modernizations would increase capacity at any school. Permanent buildings would not be demolished or constructed. With the exception of Kettering ES, all work planned at the seven other schools is considered minor and would not have any direct or indirect effect on the existing environment or surrounding neighborhoods.

Contact Information

Name
Jacquelyn Roberts
Agency Name
Long Beach Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Cross Streets
Silvera Ave and East 7th St
Zip
90810
Total Acres
10.32
Parcel #
7237-001-901
State Highways
22, 1
Railways
UPRR, Metro Blue Line
Airports
LB
Schools
Numerous
Waterways
Los Cerritos Channel; San Gabriel River
Township
4S
Range
13W
Section
23
Base
SB

Notice of Determination

Approving Agency
Long Beach Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No