Water System Reliability Project (Project)

3 Documents in Project

Summary

SCH Number
2017081032
Lead Agency
London Community Services District
Document Title
Water System Reliability Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
4/23/2020
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes addressing existing distribution and source capacity deficiencies by equipping the existing Well No. 5 with a new pump, booster pump system, hydropneumatic tank, site piping, and appurtenances to connect to a newly constructed 900,000 gallon steel water storage tank. The capacity of the existing drainage pond located on the Well No. 5 parcel will not substantially change, as material from the existing pond will be excavated to build the foundation for the storage tank, effectively maintaining the existing capacity of the drainage pond. The Project also includes replacement of approximately 12,000 linear feet of primarily 4-inch diameter asbestos/cement and steel pipeline with 8-inch diameter PVC pipeline, approximately 10 fire hydrants, a SCADA system, sectionalizing valves, water services, and other incidental items throughout the Water District.

Contact Information

Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
London
Counties
Tulare
Other Location Info
Northwest section of Ave 376 and Rd 60, London, Tulare County, California 93618

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print