21st Street Park Improvement Project

4 Documents in Project

Summary

SCH Number
2017081007
Lead Agency
Del Mar, City of (City of Del Mar)
Document Title
21st Street Park Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2017
Present Land Use
General Plan: Rail, Zoning: Rail, Public park (PP)

Document Description
The 0.22-acre project site includes a 203-foot segment of an unnamed, unlined drainage ditch that is approximately 5 feet in diameter. Water flows from west to east through the ditch; flows are intermittent/ perennial and are typically from urban runoff and storm events. The proposed project would permanently place a 36-inch solid storm drain pipe (connecting at both culvert outlets) and fill materials within the 203-foot portion of the unnamed drainage feature. The proposed project would also involve rehabilitation grading of the existing drainage channel to approximately match the existing surface elevations of the street. The purpose of the proposed project is to improve floodwater conveyance, maintain flow rate efficiency.

Contact Information
Tim Thiele, City Engineer
City of Del Mar
2010 Jimmy Durante Boulevard
Del Mar, CA 92014

Phone : (858) 755-9313

Location

Coordinates
32°58'01"N 117°15'58"W
Cities
Del Mar
Counties
San Diego
Cross Streets
Jimmy Durante and Camino Del Mar
Zip
92014
Total Acres
0.22
Parcel #
299-133-01
State Highways
Interstate 5
Railways
SD Northern Railway
Waterways
San Dieguito River

Notice of Determination

Approving Agency
City of Del Mar
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1050 Camino Del Mar, Del Mar, CA 92014

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print