French Lake Dam Gage Station

Summary

SCH Number
2017078501
Public Agency
Nevada Irrigation District
Document Title
French Lake Dam Gage Station
Document Type
NOE - Notice of Exemption
Received
Posted
7/28/2017
Document Description
Nevada Irrigation District (NID), in anticipation of new licensing requirements from the Federal Energy Regulatory Commission (FERC) for the Yuba-Bear Hydroelectric Project (FERC Project No. 2266), is proposing to replace the existing gage station on Canyon Creek immediately below French Lake Dam.

Contact Information

Name
Gary King
Agency Name
Nevada Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
Nevada

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302
Reasons for Exemption
The French Lake Gage work consists of reconstruction of the existing gage structure and will be conducted on the same project site as where the existing gage is located. The location of the new gage structure will only be moved roughly 50 feet downstream from the current structure location. The increase in capacity of the gage from 2.5 and 18 cfs is a negligible increase that will not greatly increase size.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print