Operation of 4 Arsenic Treatment Systems

Summary

SCH Number
2017078022
Public Agency
State Water Resources Control Board
Document Title
Operation of 4 Arsenic Treatment Systems
Document Type
NOE - Notice of Exemption
Received
Posted
7/5/2017
Document Description
The State Water Resources Control Board (State Water Board), as the responsible agency, will be issuing a water supply permit. The City of Bakersfield began construction of a treatment plant at each of the 4 well locations in February 2017. A ~20 foot long by ~10 foot wide by ~12 foot high treatment system was placed at each location. The system included storage and feed systems for chlorination and CO2, 2 tanks for arsenic absorption, and a treatment bypass line. Not more than 200 feet of 12-inch or less diameter piping was installed at each location to connect the discharge to the storm drain or sewer, the well to the treatment system, and the treatment system to the distribution system. Construction was completed in May 2017. The project will provide for the operation of these facilities.

Contact Information

Name
Tricia Wathen
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 - Class 1
Reasons for Exemption
The operation of existing public structures involving no expansion of use beyond that existing at the time of the lead agency's determination.