Yankee Slough Critical Levee Repair Project (Lake or Streambed Alteration Agreement No. 1600-2017-0147-R2)
3 Documents in Project
Summary
SCH Number
2017072016
Lead Agency
Reclamation District 1001
Document Title
Yankee Slough Critical Levee Repair Project (Lake or Streambed Alteration Agreement No. 1600-2017-0147-R2)
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2017
Present Land Use
ag, 20-acre min
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0147-R2, pursuant to section 1602 of the Fish and Game Code to the project applicant, Reclamation District 1001.
Project involves repairing a relatively small (less than 100lf) critical erosion site on a flood protection levee. Repairs involve the clearing of minor vegetation and reestablishing the design profile of the levee. It will include regrading the eroded area, placement of approx. 18 in of clean rock, cover placement with soil, and hydroseeding.
Contact Information
Name
Amy Kennedy
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Sutter
Cross Streets
Hwy 70 & Rio Oso Rd
Zip
95674
Total Acres
0.10
Parcel #
28-040-022
State Highways
70
Railways
UPRR
Waterways
Yankee Slough & Bear River
Township
13N
Range
4E
Section
21
Base
Nicolaus
Other Location Info
Rio Oso
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.