South Land Park and Richmond Grove Water Meter Retrofits Project

Summary

SCH Number
2017072013
Lead Agency
Sacramento, City of (City of Sacramento)
Document Title
South Land Park and Richmond Grove Water Meter Retrofits Project
Document Type
MND - Mitigated Negative Declaration
Received

Document Description
The proposed project would include installation of approx 3,200 water meters in residential backyards/alleys and front yards (in or behind sidewalks) in the South Lane Park and Richmond Grove areas of Sacramento. The meters would be installed on existing residential and commercial water service connections. Each water meter would include a combination of meter setters, fittings and piping to connect the meter to the water main. The installation of the water meters would be done in a manner as to minimize ground disturbance. The water meters would be placed in a rectangular meter box (28 in by 18 in) with a concrete or Fibrelyte lid flush with the existing landscape grade. Typical excavation for meter box would measure approx 3 ft x 3 ft, to a depth of approx 3 ft. After the meter box is installed, landscape areas would be returned to pre-installation conditions (based on pre-construction photographs taken at the site) or disturbed sidewalks would be restored. Repairs to street surfaces would also be completed, as necessary. Automated Meter Infrastructure systems would be installed, consisting of a network of transponders that would send water meter readings to the city's utility billing and operations center wirelessly. If water service lines need to be replaced, these are typically installed trenchlessly by direction drilling.

Contact Information
Scott Johnson
City of Sacramento
300 Richards Blvd, 3rd floor
Sacramento, CA 95811

(916) 808-5842

Location

Coordinates
38°30'39.5"N 121°30'46.3"W
Cities
Sacramento
Counties
Sacramento
Cross Streets
10th st, W St, 15th St; Fruitridge Ave, Freeport Blvd, Florin Rd
Total Acres
1,000
Parcel #
various
State Highways
I-5, I-80, SR 160, SR 99
Railways
UPRR
Airports
Sacramento Executive
Waterways
Sacramento River
Base
MDBM

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (water meter retrofits)
Local Action
Other Action Other Action: infrastructure
Project Issues
Other Issues Cumulative Effects Landuse Growth Inducing Wetland/Riparian Water Supply Water Quality Vegetation Tribal Cultural Resources Traffic/Circulation Toxic/Hazardous Solid Waste Soil Erosion/Compaction/Grading Sewer Capacity Septic System Schools/Universities Recreation/Parks Public Services Population/Housing Balance Noise Minerals Geologic/Seismic Forest Land/Fire Hazard Flood Plain/Flooding Drainage/Absorption Biological Resources Archaeologic-Historic Air Quality Agricultural Land Aesthetic/Visual Other Issues: GHG
Reviewing Agencies
Regional Water Quality Control Bd., Region 5 (Sacramento) California Department of Parks and Recreation California Highway Patrol California Public Utilities Commission Caltrans, Division of Aeronautics Department of Fish and Wildlife, Region 2 Department of Water Resources Native American Heritage Commission Resources Agency State Water Resources Control Board, Division of Drinking Water State Water Resources Control Board, Divison of Financial Assistance
Download CSV New Search