Persea (Lake or Streambed Alteration Agreement No. 1600-2017-0214-R5)

5 Documents in Project

Summary

SCH Number
2017071056
Lead Agency
Vista, City of (City of Vista)
Document Title
Persea (Lake or Streambed Alteration Agreement No. 1600-2017-0214-R5)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0214-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, LLJ Orion Pacific Vista, LLC. The project will replace the on-site earthen stream with underground storm drain infrastructure to develop a multifamily residential development. The vegetation in the stream will be removed, trenches will be excavated, and storm drain pipes will be installed. The project will permanently impact 0.76 acre of stream bed, bank, and channel. The project will mitigate permanent impacts through the deduction of 0.75 credit at a CDFW-approved mitigation bank as well as enhancing 0.75 acre within a 1.35 acre off-site mitigation area in San Marcos Creek.

Contact Information
Kevin Hupf
CDFW
3883 Ruffin Road
San Diego, CA 92123

858-636-3160

Location

Coordinates
33°13'5.9"N 117°14'37.2"W
Cities
Vista
Counties
San Diego
Cross Streets
N. Santa Fe Ave/Canea St.
Zip
92084
Parcel #
173-080-39, 24, 38, 04, 37, 06, 07, 18, 17, 20, 22, 36
State Highways
Hwy 78
Railways
NCTD Sprinter
Schools
Bobier ES; Vista HS; Maryland ES
Waterways
Buena Vista Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3883 Ruffin Road, San Diego, CA 92123

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search