Former Golden Eagle Refinery Amended Remedial Action Plan - Operable Unit 1 and Feasibility Study Remedial Action plan - Operable Unit 2
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017071035
- Lead Agency
- Toxic Substances Control, Department of (Department of Toxic Substances Control)
- Document Title
- Former Golden Eagle Refinery Amended Remedial Action Plan - Operable Unit 1 and Feasibility Study Remedial Action plan - Operable Unit 2
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/11/2017
- Present Land Use
- Z: ML and ML-ORL
- Document Description
- Conduct an engineered anaerobic bio-oxidation (ABOx) via sulfate reduction in Operable Unit 1 and install 2 to 8 groundwater extraction wells and conduct hydraulic containment of the groundwater plume in Operable Unit 2.
- Contact Information
-
Dan Zogaib
Department of Toxic Substances Control
5796 Corporate Ave
Cypress, CA 90630
Phone : (714) 484-5483
Location
- Coordinates
- 33°50'22.58"N 118°16'59.18"W
- Cities
- Carson
- Counties
- Los Angeles
- Cross Streets
- Torrance Blvd and Figueroa St
- Zip
- 90745
- Total Acres
- 76
- Parcel #
- 7336-002-01 thru 7336-002-022
- State Highways
- I-110, 405
- Railways
- AT&SF
- Schools
- Carson St ES, Van Deere Ave ES, White MS, Carson MS
- Waterways
- Dominguez Channel
Notice of Determination
- Approving Agency
- DTSC
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 5796 Corporate Ave., Cypres, CA 90630
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.