Municipal Waterways Maintenance Plan - Mission Bay Drive 1 Channel

9 Documents in Project

Summary

SCH Number
2017071022
Lead Agency
City of San Diego
Document Title
Municipal Waterways Maintenance Plan - Mission Bay Drive 1 Channel
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2020
Document Description
The project will remove accumulated sediment and vegetation from the earthen-bottom channel in order to restore conveyance capacity, thereby reducing risk of flooding to adjacent and upstream infrastructure. Water will be temporarily diverted around the work area using temporary sandbag berms, a pump, hose, and filter bag. Vactor machines may be used to remove ponded water from the channel if necessary. A bulldozer or tracksteer will be lowered into the channel to push sediment and vegetation into piles. The resulting piles will be removed from the channel with an excavator stationed outside the channel and disposed of offsite at an authorized location.

Contact Information

Name
Jill Harris
Agency Name
RWQCB - San Diego Region
Contact Types
Lead/Public Agency

Name
Agency Name
City of San Diego, Storm Water Department
Contact Types
Project Applicant

Location

Cities
San Diego
Counties
San Diego
Other Location Info
2702 N Mission Bay Dr., San Diego, San Diego County

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print