Ocean Outfall System Rehabilitation; Outfall Low Flow Pump Station (Project No. J-117B)

2 Documents in Project

Summary

SCH Number
2017071012
Lead Agency
Orange County Sanitation District
Document Title
Ocean Outfall System Rehabilitation; Outfall Low Flow Pump Station (Project No. J-117B)
Document Type
NOD - Notice of Determination
Received
Posted
9/28/2017
Present Land Use
GP: Public; Z: Industrial limited and residential ag with an oil overlay

Document Description
The project includes construction of a new joint Outfall Low Flow Pump Station/Plant Water Pump Station facility and rehabilitation of the existing Ocean Outfall Booster Station, Central Power Generation Building, Effluent Pump Station Annex (EPSA), and Standby Power Facility to repair and improve the reliability and efficiency of the existing Ocean Outfall System. Among other minor upgrades, a new 2-megawatt diesel standby generator will be added to the existing EPSA, which currently houses four existing generators. The project will occur entirely within the boundaries of OCSD's existing Plant 2 wastewater treatment facility located in Huntington Beach, CA.

Contact Information
Kevin Hadden
Orange County Sanitation District
10844 Ellis Avenue
Fountain Valley, CA 92708-7018

Phone : (714) 593-7462

Location

Coordinates
33°38'20"N 117°57'21"W
Cities
Huntington Beach
Counties
Orange
Cross Streets
Brookhurst St and Pacific Coast Hwy (SR-1)
Zip
92646
Total Acres
2
Parcel #
Mult
State Highways
SR-1
Schools
Various
Waterways
Santa Ana River, Pacific Ocean
Township
6S
Range
10W
Section
20

Notice of Determination

Approving Agency
Orange County Sanitation District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
10844 Ellis Ave., Fountain Valley, CA 92708

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search