1-97NTMP-020 SCR Burton

Summary

SCH Number
2017069007
Lead Agency
Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
Document Title
1-97NTMP-020 SCR Burton
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2017

Document Description
Project is located 5 miles north of the town of Soquel within the West Branch Soquel Planning Watershed, in Santa Cruz County, State of CA; UTM Easting 10593303 and Northing 4102668, Zone 10, NAD 83 or WGS 84, on APN 099-011-09. The project is limited to: removal and replacement of two culverts at watercourse crossing C and D, and an armored critical dip. Inlets will have trash racks installed and outlets will be rock armored with additional rock for energy dissipaters. Waterbreaks will be installed fifty feet on either side of both crossings, WLPZ road segments rocked for 100 foot, and bare soil covered with mulch and native grass seed. Temporary cofferdams will be placed upstream with 4 inch minimum diameter plastic pipes to divert water around channels for unrestricted flow if water is present during work activities.

Contact Information
Jeanne Wetzel Chinn
CDFW
7329 Silverado Trail
Napa, CA 94558

Phone : (707) 576-2793

Location

Counties
Santa Cruz

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.