Giannini Bridge Replacement (Lake or Streambed Alteration Agreement No. 1600-2017-0068-R3)

4 Documents in Project

Summary

SCH Number
2017062080
Lead Agency
San Mateo County
Document Title
Giannini Bridge Replacement (Lake or Streambed Alteration Agreement No. 1600-2017-0068-R3)
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2018
Present Land Use
existing wood bridge over Butano Creek/planned agricultural district/ag
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0068-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Peninsula Open Space Trust. Project is limited to replacement of a damaged bridge. The gravel access roads and bridge decking will be widened from 12 to 20 feet, requiring removal of two trees. New abutments will be constructed on the top of the bank, outside of the wetted channel and ordinary high water. The abutments will consist of concrete spread footings, a stem wall, and associated wing walls. Approx. 76 cubic yards of concrete will be used for the abutments, and 400 cubic yards of engineered fill will be used to backfill the structure and raise the bridge approach to the deck height.

Contact Information

Name
Randi Adair
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
San Mateo
Cross Streets
Pescadero Creek Rd
Zip
94060
Total Acres
616.20
Parcel #
086-270-010, 087-190-010
Waterways
Butano Creek
Other Location Info
Pescadero

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.