State Route 58 Trout Creek Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2019-0136-R4)

7 Documents in Project

Summary

SCH Number
2017061076
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
State Route 58 Trout Creek Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2019-0136-R4)
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2021
Document Description
The Project involves utility relocation, the replacement of the existing State Route 58 bridge over Trout Creek, the recontouring of two roadside drainage ditches outside of the stream, and the replacement of armoring within the stream. This Major Amendment No. 1 amends the Streambed Alteration Agreement to reflect design changes to the temporary water diversion, the construction of a single-lane detour road, and a change in the timing of activities.

Contact Information

Name
Meg Perry
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency

Name
Javier Mendez
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Counties
San Luis Obispo
Other Location Info
The Project will occur in the Trout Creek channel near where it flows towards the Salinas River beneath State Route 58 approximately two miles east of the town of Santa Margarita, San Luis Obispo County. The Project involves construction within the banks of the channel along a 315-foot reach of Trout Creek and outside of the stream - including 426 feet of drainage ditches parallel to the road along State Route 58. The Project Site is located within Section 21, Township 29 South, Range 13 East, Mount Diablo Baseline and Meridian

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print