Seville 4 Solar Project

3 Documents in Project

Summary

SCH Number
2017061062
Lead Agency
Imperial County
Document Title
Seville 4 Solar Project
Document Type
FIN - Final Document
Received

Document Description
The project consists of the construction, operation and reclamation of a 146 or 174-acre, 20 MW solar PV energy project on 572.10 acres in a portion of Imperial County APN 018-170-057-000, Lot 8 of Tract Map No. 00988 in west-central. The project would use the existing private access road extending south from Hwy 78 to the Seville Solar Farm Complex. The project would also include internal access roads and infrastructure (i.e. PV modules, inverters, internal transmission lines, security fence, etc.). The project will connect to the existing substation via a tie-in at Lot 3 to an existing pole line that connects the Seville 3 Solar Project to the substation. A 20,000-gallon water tank for fire protection and 14-acre retention basin for stormwater are also proposed on the site.

Contact Information
Patricia Valenzuela
Imperial County
801 Main Street
El Centro, CA 92243

442-265-1749

Location

Coordinates
33°6'40.5"N 116°0'7.39"W
Counties
Imperial
Cross Streets
8 mi west of juntion of SR 78 and SR 98
Zip
92024
Total Acres
340
Parcel #
018-170-057-000
State Highways
78
Waterways
San Filippe Creek
Township
12S
Range
9E
Section
23
Base
SBBM
Other Location Info
Borrego Springs

Notice of Completion

Development Type
Power:Solar (20 Watts)
Local Action
Rezone General Plan Amendment
Project Issues
Other Issues Cumulative Effects Landuse Growth Inducing Wetland/Riparian Water Supply Water Quality Vegetation Traffic/Circulation Toxic/Hazardous Solid Waste Soil Erosion/Compaction/Grading Public Services Noise Geologic/Seismic Forest Land/Fire Hazard Flood Plain/Flooding Drainage/Absorption Biological Resources Archaeologic-Historic Air Quality Aesthetic/Visual Other Issues: CEQA Appendix F