Permit No. 19509: Fresno County - Sand Creek Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2017061045
Lead Agency
Fresno County
Document Title
Permit No. 19509: Fresno County - Sand Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2020
Project Applicant
Fresno County Department of Public Works and Planning (Fresno County)

Document Description
Approval of Permit No. 19509, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To remove and replace the existing 23 feet wide and 31 feet long, two-lane Sand Creek Bridge located on the Ennis Road with a new 26 feet 10 inches wide and 101 feet long two-lane bridge that meets the current standards.

Contact Information
Itzia Rivera
Central Valley Flood Protection Board
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821

Phone : (916) 480-5388
itzia.rivera@cvflood.ca.gov

Location

Counties
Fresno
Other Location Info
The project is located on Ennis Road over Sand Creek, about 4.4 miles southeast of State Route 180 in Fresno County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Board's administrative record of proceedings related to the encroachment permit is available for public review at the Board's office. Please note, the NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print