Bison Avenue Surface Parking Lot

2 Documents in Project

Summary

SCH Number
2017061043
Lead Agency
University of California, Irvine
Document Title
Bison Avenue Surface Parking Lot
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2017
Present Land Use
UCI is not subject to local zoning regulations. Permitted uses in 2007 UCI LRDP allow parking facilities
Document Description
The proposed project would construct an approx 330,000 gsf surface parking lot that would accommodate up to 1,100 spaces on the approx 7.6-acre site. The project scope includes vegetation clearing; grading; asphalt paving including two driveway connections to Health Sciences Drive; construction of pedestrian walkways; and installation of lighting to allow 24-hour use, drainage improvements, electric vehicle charging stations, landscaping, and irrigation. The proposed project would be constructed to allow for the future installation of an information booth and security access gate if deemed necessary at a later time.

Contact Information

Name
Richard Demerjian
Agency Name
University of California, Irvine
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
Bison Ave and California Ave
Zip
92697
Total Acres
7.6
State Highways
SR 73, I-405
Schools
Tarbut V'Torah
Waterways
San Diego Creek

Notice of Determination

Approving Agency
UC, Irvine
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print