Haynes Generating Station Units 3 Through 6 Demolition Project

2 Documents in Project

Summary

SCH Number
2017061033
Lead Agency
Los Angeles Department of Water and Power
Document Title
Haynes Generating Station Units 3 Through 6 Demolition Project
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2017
Present Land Use
planned development district, PD-1 SEADIP in Subarea 19
Document Description
The proposed project would include the removal of units 3, 4, 5, and 6, which were originally constructed more than 5 decades ago, to minimize health and safety risks and reduce future maintenance. Although these units were operationally decommissioned, the units were left physically in place. Tanks D and E, which are empty and have been cleaned, are also proposed for demolition. In addition, various ancillary facilities would also be demolished as part of the project. These include electrical and control buildings, generator step-ups, polishing tank, maintenance shop, and storage structures. The duration of demolition and associated activities would be approx 2.5 years

Contact Information

Name
Julie Van Wagner
Agency Name
Los Angeles Department of Water and Power
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Cross Streets
East 22nd St
Zip
90803
Total Acres
160
Parcel #
7237018270, 7237019270
State Highways
State Road 22
Airports
Los Alamitos Army Airfield
Schools
Rosie the Riveter HS
Waterways
Orange County Flood Channel, San Gabriel River
Base
Mt.SanB

Notice of Determination

Approving Agency
LA Dept. of Water and Power
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print