High Desert Water Bank
10 Documents in Project
Summary
SCH Number
2017061030
Lead Agency
Metropolitan Water District of Southern California
Document Title
High Desert Water Bank
Document Type
NOD - Notice of Determination
Received
Posted
1/15/2019
Document Description
AVEK (lead agency) approved the development and operation of a groundwater bank on approximately 1,500 acres at the western edges of the Antelope Valley. The project would store State Water Project (SWP) water during wet weather years when supplies exceed demands, and would recover the water during dry weather years when demands exceed supplies or at other times when there are disruptions to SWP supplies. Implementation of this project will require the construction of monitoring
and production water wells, turnouts off of the California Aqueduct, underground and above ground pipelines, recharge basins, and water storage and booster pump facilities.
Metropolitan (responsible agency) would pay AVEK for the capital costs for construction of monitoring and production wells, turnouts from the California Aqueduct, underground and aboveground pipelines, recharge basins, water storage, and booster pump facilities.
Contact Information
Name
Sean Carlson
Agency Name
Metropolitan Water District of Southern CA
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Los Angeles
Other Location Info
Adjacent to the California Aqueduct between 300th Street West and 280th Street West within the County of Los Angeles (see map).
Notice of Determination
Approving Agency
Metropolitan Water District of Southern CA
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.