Belridge Water Storage District Solar Project

2 Documents in Project

Summary

SCH Number
2017061005
Lead Agency
Belridge Water Storage District
Document Title
Belridge Water Storage District Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
9/13/2017
Present Land Use
8.1 (intensive ag)/Zone A
Document Description
The proposed project is a fenced and gated 8.5 mw solar pv energy generation facility, consisting of approx. 26,000 pv panels, and is intended to offset about 95% of the cost of the current electrical energy demand of BWSD's Pumping Plant A and Pumping Plant B facilities. The solar panels would occupy approx. 47 acres of the 55-acre site and would be mounted on a single axis tracking system in order to maximize sunlight capture. The solar panels would have a max height of eight ft at max tilt. The facility would also interconnect Belridge Water Storage District's two existing meters, one at the Pumping Plant A facility and the second at the pumping plant B facility, via an underground conduit installation approx. 9,600 ft in length. A 13,000 foot by 20 foot maintenance and fire access road would be constructed between and around the panels and would be covered with crushed rock.

Contact Information

Name
Greg Hammett
Agency Name
Belridge Water Storage District
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
7th Standard Rd/Lost Hills Rd
Zip
93251
Parcel #
085-220-14
State Highways
33
Waterways
CA Aqueduct
Other Location Info
Lost Hills

Notice of Determination

Approving Agency
Belridge Water Storage District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.