Belridge Water Storage District Solar Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017061005
- Lead Agency
- Belridge Water Storage District
- Document Title
- Belridge Water Storage District Solar Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/13/2017
- Present Land Use
- 8.1 (intensive ag)/Zone A
- Document Description
- The proposed project is a fenced and gated 8.5 mw solar pv energy generation facility, consisting of approx. 26,000 pv panels, and is intended to offset about 95% of the cost of the current electrical energy demand of BWSD's Pumping Plant A and Pumping Plant B facilities. The solar panels would occupy approx. 47 acres of the 55-acre site and would be mounted on a single axis tracking system in order to maximize sunlight capture. The solar panels would have a max height of eight ft at max tilt. The facility would also interconnect Belridge Water Storage District's two existing meters, one at the Pumping Plant A facility and the second at the pumping plant B facility, via an underground conduit installation approx. 9,600 ft in length. A 13,000 foot by 20 foot maintenance and fire access road would be constructed between and around the panels and would be covered with crushed rock.
- Contact Information
-
Greg Hammett
Belridge Water Storage District
21908 7th Standard Rd
McKittrick, CA 93251
Phone : (661) 762-7316
Location
- Counties
- Kern
- Cross Streets
- 7th Standard Rd/Lost Hills Rd
- Zip
- 93251
- Parcel #
- 085-220-14
- State Highways
- 33
- Waterways
- CA Aqueduct
- Other Location Info
- Lost Hills
Notice of Determination
- Approving Agency
- Belridge Water Storage District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 21908 Seventh Standard Road, McKittirick, CA 93251
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.