Padres Trail Desilting Basin

3 Documents in Project

Summary

SCH Number
2017061001
Lead Agency
La Canada Flintridge, City of (City of La Canada Flintridge)
Document Title
Padres Trail Desilting Basin
Document Type
NOD - Notice of Determination
Received
Posted
12/12/2018
Present Land Use
GP: Very low density res/Z: R-1-20,000

Document Description
The project site is located at the Southern terminus of Encinas Dr. The site is currently an undeveloped, dry creek channel that generally slopes uphill to the south and is heavily vegetated. The City proposes construction of an earthen desilting basin and concrete spillway within the 29,300-square foot project site. The area of the proposed desilting basin would be approximately 8,2000 square feet and would have a total storage capacity of 850 cubic yards. The basin would serve to reduce the flows and trap sediment before delivery to Padre Trail. The project would include installation of a concrete access apron, a manual swing gate and pole fencing around the parameter.

Contact Information
Susan Koleda
City of La Canada Flintridge
1327 Foothill Boulevard
La Canada Flintridge, CA 91011-2137

Phone : (818) 790-8881

Location

Coordinates
34°11'52"N 118°12'27"W
Cities
La Canada-Flintridge
Counties
Los Angeles
Cross Streets
Encinas Dr and Padres Trail
Zip
91011
Total Acres
29,300 sf
Parcel #
5813-012-900
State Highways
2, 210
Schools
La Canada ES

Notice of Determination

Approving Agency
City of La Canada Flintridge
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City Clerk - 1327 Foothill Blvd., and City Library - 4545 N Oakwood Ave, La Canada Flintridge, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No