Improving Commercial Viability of Fast Charging by Providing Renewable Integration and Grid Services with Integrated Multiple DC Fast Chargers

Summary

SCH Number
2017058190
Lead Agency
Energy Commission (California Energy Commission)
Document Title
Improving Commercial Viability of Fast Charging by Providing Renewable Integration and Grid Services with Integrated Multiple DC Fast Chargers
Document Type
NOE - Notice of Exemption
Received

Document Description
This project will fund development and demonstration of a real-time load management system to balance direct current fast charging needs, grid load needs, and renewable energy generation. The Greenlot system will aggregate and integrate DC fast charging with on site energy storage to balance grid peak loads and renewable energy over-generation.

Contact Information
Matthew Fung
California Energy Commission
1516 Ninth Street, MS-48
Sacramento, CA 95814

916-327-1422

Location

Counties
Los Angeles
Other Location Info
Monrovia 91016

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15303, 15304
Reasons for Exemption
This project is exempt under 15303 new construction or conversion of small structures b/c Greenlots is installing new electric vehicle charging stations and stationary battery energy storage that will not result in serious or major disturbance to an environmental resource. This project is exempt under 15304 Minor alterations to land b/c Greenlots will trench and backfill to extend electrical lines and conduit to the new electric vehicle charging stations and stationary battery energy storage. The trenching will occur in an existing asphalt parking lot, which will not include the removal of healthy, mature, or scenic trees.