RD 2074 14-Mile Slough Levee Improvement
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017052039
- Lead Agency
- Reclamation District 2074 (Reclamation District No. 2074)
- Document Title
- RD 2074 14-Mile Slough Levee Improvement
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/31/2018
- Present Land Use
- levee/unzoned/low density residential
- Document Description
- Approval of Permit No. 19228, under CA Code of Regulations, Title 23, Section 6 for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To construct a continuous 450 linear foot soil-cement-bentonite cutoff wall to a depth of 48 feet on the left(south) bank levee of the 14-mile Slough.
- Contact Information
-
James Herota
Central Valley Flood Protection Board
3310 El Camino Ave., Suite 170
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Coordinates
- 37°59'38"N 121°20'58"W
- Cities
- Stockton
- Counties
- San Joaquin
- Cross Streets
- Feather River Dr
- Zip
- 95219
- Total Acres
- 0.21
- Parcel #
- 116-020-01
- State Highways
- 5
- Schools
- Tully Knoles ES
- Waterways
- 14-Mi Slough
- Township
- 2N
- Range
- 6E
- Base
- MDBM
Notice of Determination
- Approving Agency
- Central Valley Flood rotection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave., Suite 170, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.