Bridgeport Covered Bridge Rehabilitation, Restoration and Accessibility Project

3 Documents in Project

Summary

SCH Number
2017052010
Lead Agency
Parks and Recreation, Department of (California Department of Parks and Recreation)
Document Title
Bridgeport Covered Bridge Rehabilitation, Restoration and Accessibility Project
Document Type
NOD - Notice of Determination
Received

Document Description
CSP would like to restore full access to the historic Bridgeport Covered Bridge by replacing the existing temporary support with a permanent stabilization design, and by providing accessibility improvements. The intent of the proposed project is to perform necessary repairs to remove the temporary non-historic bridge stabilization features, allow access to the public, and to preserve the Bridge for the enjoyment of future generations. Rehabilitation of the bridge is in-line with CSP's mission to provide for the health, inspiration, and education of the people of CA by helping to preserve the state's extraordinary biological diversity, protecting its most valued natural and cultural resources, and creating opportunities for high-quality outdoor recreation.

Contact Information
Brad Michalk
California Department of Parks and Recreation
1 Capital Mall, Suite 410
Sacramento, CA 95814

916-445-8783

Location

Coordinates
39°17'33.7"N 121°11'41.7"W
Cities
Nevada City
Counties
Nevada
Cross Streets
Bridgeport Covered Bridge
Zip
95946
Parcel #
01-170-45, -41
Waterways
South Yuba River
Township
17N
Range
7E
Section
33
Base
MD

Notice of Determination

Approving Agency
CA State Parks
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
One Capitol Mall, Suite 410, Sacramento, Ca 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search