Martin Slough Enhancement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0195-R1)

5 Documents in Project

Summary

SCH Number
2017052008
Lead Agency
Humboldt County
Document Title
Martin Slough Enhancement Project (Lake or Streambed Alteration Agreement No. 1600-2017-0195-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
The project consists of 19 encroachments for enhancement of Martin Slough and its tributaries including 1) widening and deepening the Martin Slough channel, 2) creation of one new freshwater pond and 3) enlargement of an existing pond, 4) daylighting a Martin Slough tributary that currently travels through underground pipes, 5-18) replacement or reinstallation of 14 stream crossings (11 golf cart bridges on the Eureka municipal golf course; replacing an agricultural culvert crossing with a bridge crossing; rerouting a "ditched" tributary and installing a culvert for utility maintenance access), and 19) installation of large wood structures for habitat enhancement in the newly created ponds and excavated channel. The project also consists of re-contouring pasture and golf course areas to improve drainage and eliminate the potential for fish stranding, and wetland/riparian revegetation.

Contact Information
Jennifer Olson
CDFW
619 Second Street
Eureka, CA 95501

707-445-5387

Location

Coordinates
40°45'9.05"N 124°10'45.6"W
Cities
Eureka
Counties
Humboldt
Cross Streets
Pine Hill Rd and Meyers Ave
Zip
95501
Total Acres
61.2
State Highways
101
Schools
Cutten and Grant ES
Waterways
Martin Slough, Swain Slough, Humboldt Bay
Township
4N
Range
1W
Section
3

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search