Alamo Pintado Creek Pedestrian Bridge Project NOD
4 Documents in Project
Download CSV
Download All Attachments
New Search
Print
Summary
- SCH Number
- 2017051053
- Lead Agency
- California Department of Transportation, District 5 (DOT)
- Document Title
- Alamo Pintado Creek Pedestrian Bridge Project NOD
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/2/2021
- Present Land Use
- Transportation
- Document Description
- The California Department of Transportation (Caltrans) proposes to remove the Alamo Pintado Creek Pedestrian Bridge (bridge number 51-0076Y) at post mile R2.6 on the south side of State Route 154 in the town of Los Olivos in Santa Barbara County. The project would also remove a retaining wall next to the bridge and install rock slope protection. The existing bridge structure is 92 feet long by 28 feet wide and spans the Alamo Pintado Creek.
- Contact Information
-
Jason Wilkinson
Caltrans District 5
Lead/Public Agency
50 Higuera Street
San Luis Obispo, CA 93401
Phone : (805) 542-4663
jason.wilkinson@dot.ca.gov -
California Department of Transportation
Project Applicant
Location
- Cities
- Los Olivos
- State Highways
- 154
Notice of Determination
- Approving Agency
- Caltrans District 5
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://dot.ca.gov/caltrans-near-me/district-5/district-5-current-projects/alamo-pintado-creek-pedestrian-bridge-project
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 05-1C410 NOD signed PDF 539 K 2021 Environmental Filing Fee Cash Receipt_DFG 753 PDF 328 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.