GWMA Recycled Water Pipelines Project in the City of Lynwood
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017051049
- Lead Agency
- Central Basin Municipal Water District
- Document Title
- GWMA Recycled Water Pipelines Project in the City of Lynwood
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/29/2017
- Present Land Use
- N/A; Public street ROW
- Document Description
- The project would include the installation of approx 9,408 lf of recycled water pipeline varying in size from 8-12 in diameter. The proposed recycled water pipeline would connect to Central Basin's 8-in diameter recycled water pipeline at the intersection of Wright Rd and Fernwood Ave. It would extend approx 6,113 lf in an easterly direction along Fernwood Ave to its intersection with Bullis Rd. Approx 2,425 lf of recycled water pipeline would extend along Bullis Rd in a northerly direction to the Lynwood Civic Center Complex. Approx 424 lf of 8-in diameter recycled water pipeline would extend in a southerly direction from Fernwood Ave along Harris Ave and another 435 lf of 8-in diameter recycled water pipeline would extend in a southerly direction from Fernwood Ave along Atlantic Ave. The new recycled water pipeline would serve the new Lynwood Linear Park along Fernwood Ave, the Lynwood City Park and the Lynwood City Hall Complex along Bullis Rd.
- Contact Information
-
Keith S. Dunbar
Central Basin Municipal Water District
45375 Vista Del Mar
Temecula, CA 92590-4314
Phone : (951) 699-2082
Location
- Coordinates
- 33°55'18"N 118°13'06"W
- Cities
- Lynwood
- Counties
- Los Angeles
- Cross Streets
- Fernwood Ave and Bullis Rd
- Zip
- 90262
- State Highways
- 105, 710
- Waterways
- Rio Hondo
- Base
- SBBM
Notice of Determination
- Approving Agency
- Board of Directors of the Central Basin Municipal Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 6242 Telegraph Road, Commerce, CA 90040-2512
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.