GWMA Recycled Water Pipelines Project in the City of Bell Gardens
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017051048
- Lead Agency
- Central Basin Municipal Water District
- Document Title
- GWMA Recycled Water Pipelines Project in the City of Bell Gardens
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/29/2017
- Present Land Use
- N/A; Public ROW
- Document Description
- Project would include the installation of approx. 5,835 lineal feet of recycled water pipeline varying in diameter from 8 to 16 inches. The proposed recycled water pipeline would connect to Central Basin's 16-inch diameter recycled water pipeline in Garfield Ave. at its intersection with Park Lane. The pipeline would be installed in Garfield Avenue in a northerly direction to its intersection with Florence Place the pipeline would be reduced in diameter to 12 inches. Approx. 2,600 lineal feet of 12-inch diameter pipeline would be installed in an easterly direction in Florence Place to its intersection with Sudan Avenue. Approx. 230 lineal feet of 8-inch diameter recycled water pipeline would also be installed in Emil Avenue in a northerly direction from Florence Place. The new recycled water pipeline would serve Veterans Park and Suva Elementary/Middle School Complex.
- Contact Information
-
Keith S. Dunbar
Central Basin Municipal Water District
45375 Vista Del Mar
Temecula, CA 92590-4314
Phone : (951) 699-2082
ksdpe67@gmail.com
Location
- Coordinates
- 33°57'59"N 118°09'04"W
- Cities
- Bell Gardens
- Counties
- Los Angeles
- Cross Streets
- Garfield Ave and Florence Place
- Zip
- 90201
- State Highways
- 5, 710
- Schools
- Suva School Complex
- Waterways
- Rio Hondo
- Base
- SBBM
Notice of Determination
- Approving Agency
- Board of Directors, Central Basin Municipal WAter District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 6242 Telegraph Road, Commerce, CA 90040-2512
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.