GWMA Recycled Water Pipelines Project in the City of Bell Gardens
4 Documents in Project
Summary
SCH Number
2017051048
Lead Agency
Central Basin Municipal Water District
Document Title
GWMA Recycled Water Pipelines Project in the City of Bell Gardens
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2017
Present Land Use
N/A; Public ROW
Document Description
Project would include the installation of approx. 5,835 lineal feet of recycled water pipeline varying in diameter from 8 to 16 inches. The proposed recycled water pipeline would connect to Central Basin's 16-inch diameter recycled water pipeline in Garfield Ave. at its intersection with Park Lane. The pipeline would be installed in Garfield Avenue in a northerly direction to its intersection with Florence Place the pipeline would be reduced in diameter to 12 inches. Approx. 2,600 lineal feet of 12-inch diameter pipeline would be installed in an easterly direction in Florence Place to its intersection with Sudan Avenue. Approx. 230 lineal feet of 8-inch diameter recycled water pipeline would also be installed in Emil Avenue in a northerly direction from Florence Place. The new recycled water pipeline would serve Veterans Park and Suva Elementary/Middle School Complex.
Contact Information
Name
Keith S. Dunbar
Agency Name
Central Basin Municipal Water District
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Bell Gardens
Counties
Los Angeles
Cross Streets
Garfield Ave and Florence Place
Zip
90201
State Highways
5, 710
Schools
Suva School Complex
Waterways
Rio Hondo
Base
SBBM
Notice of Determination
Approving Agency
Board of Directors, Central Basin Municipal WAter District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.