16-CUP-06 Battery Energy Storage System

2 Documents in Project

Summary

SCH Number
2017051036
Lead Agency
City of Santa Paula
Document Title
16-CUP-06 Battery Energy Storage System
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2018
Present Land Use
LU: Developed light industrial/Z: Commercial-light industrial/GP: Commercial/light industrial
Document Description
Construction and operation of a battery electrical storage system that would store up to MW of electricity for dispatch into the local Southern CA Edison grid via the existing adjacent Wakefield Substation. The storage system would consist of 20 self-contained battery storage modules that would each house mounting battery racks, 22 lithium-ion battery cells, and associated electrical equipment. The battery storage modules would be made from converted shipping containers. The storage modules would be surrounded by an access drive aisle. An overhead solar panel array would be containers. The storage modules would be surrounded by an access drive aisle. An overhead solar panel array would be constructed across the top of the modules to charge the batteries. The entire project site would be fenced for security and restricted access. An existing office building on the site would be renovated and used as an office by the project applicant.

Contact Information

Name
Janna Minsk
Agency Name
City of Santa Paula
Contact Types
Lead/Public Agency

Location

Cities
Santa Paula
Counties
Ventura
Cross Streets
North 13th St & East Main St
Zip
93060
Total Acres
1.53
Parcel #
101-0-241-185
State Highways
150, 126
Railways
yes
Airports
Santa Paula
Schools
Yes
Waterways
Santa Clara River, Santa Paula Creek

Notice of Determination

Approving Agency
City of Santa Paula
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.