Final Remedial Action Plan for Installation Restoration Site 12, Boat Channel Sediments Remediation

2 Documents in Project

Summary

SCH Number
2017051035
Lead Agency
Regional Water Quality Control Board, Region 9
Document Title
Final Remedial Action Plan for Installation Restoration Site 12, Boat Channel Sediments Remediation
Document Type
NOD - Notice of Determination
Received
Posted
8/11/2017
Present Land Use
SD Bay
Document Description
The project will involve dredging 9.10 acres of contaminated marine sediments from the northern portion of the San Diego Bay Boat Channel to prevent a release of hazardous substances in the sediment, including: copper, lead, zinc, total chlordane, and total dichlorodiphenyltrichloroethane. Dredging will be to a depth of one to two feet. The project is expected to generate approx 23,200 cy of dredged contaminated marine sediment. The project would also include dewatering dredged material on a barge, testing dredged materials, vessel transport of dredged material to Naval Base San Diego, and truck transport of dredged materials to the Copper Mountain Landfill disposal facility in Welton, Arizona.

Contact Information

Name
David Gibson
Agency Name
Regional Water Quality Control Board, Region 9
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
San Diego Bay Boat Channel, Former Naval Training Center
Parcel #
450-790-0900, -0200
Airports
San Diego
Schools
High Tech HS
Waterways
San Diego Bay Boat Channel
Other Location Info
Point Loma

Notice of Determination

Approving Agency
RWQCB
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No