San Juan Creek ETM Pipeline Removal (Streambed Alteration Agreement No. 1600-2017-0125-R5)
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017051032
- Lead Agency
- Moulton Niguel Water District
- Document Title
- San Juan Creek ETM Pipeline Removal (Streambed Alteration Agreement No. 1600-2017-0125-R5)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/21/2017
- Document Description
- Project is limited to the removal of 180 linear feet of an abandoned 30-inch diameter pipeline. Cement encasement will be cut at the toe of the slope, and removed through trenching. After removal, the trench will be backfilled and the open ends of the pipeline will be sealed with cement. Equipment will access the project area via the San Juan Creek Trail at Alipaz Street and all materials and equipment will be stored off-site. Implementation of the project will result in 0.03 acre (180 by 10 linear feet) of temporary impacts to the channel bottom. There are no permanent impacts as a result of project activities.
- Contact Information
-
Jennifer Turner
CDFW
3883 Ruffin Road
San DIego, CA 92123
Phone : (858) 636-3160
Location
- Coordinates
- 33°29'13.2"N 117°40'1.2"W
- Cities
- San Juan Capistrano
- Counties
- Orange
- Cross Streets
- Calle Perfecto and Paseo Toscana
- Zip
- 92675
- Parcel #
- 121-171-15, -18, -44, -668-501-02
- State Highways
- I-5
- Railways
- Burlington Northern Santa Fe
- Schools
- Kinoshita ES, Del Obispo ES, Marco Foster MS
- Waterways
- San Juan Creek and Trabuco Creek
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3883 Ruffin Road, San Diego, CA 92123
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.