Encinal Dune Restoration and Shoreline Stabilization

2 Documents in Project

Summary

SCH Number
2017042078
Lead Agency
East Bay Regional Parks District
Document Title
Encinal Dune Restoration and Shoreline Stabilization
Document Type
NOD - Notice of Determination
Received
Posted
7/10/2017
Present Land Use
Z: Alameda point - open space/GP: Parks and public open space
Document Description
The East Bay Regional Parks District proposes the Encinal Dune Restoration and Shoreline Stabilization Project within the existing Encinal Beach Park area. The site offers excellent opportunities to restore the beach and adjacent dunes to a more natural condition while improving both recreation and habitat values. Currently the invasive ice plant over much of the site degrades the dune habitat. The rusty barge provides shoreline support, but has been degrading within the shoreline bank for decades. Removal of the barge and installation of more sustainable shoreline protection would stabilize the area. Water access and egress would be improved while linking with the existing Alameda Point Trail, the Encinal Boat Ramp, as well as parking area and jetty facilities.

Contact Information

Name
Joe Sullivan
Agency Name
East Bay Regional Parks District
Contact Types
Lead/Public Agency

Location

Cities
Alameda
Counties
Alameda
Cross Streets
Alameda Point Shoreline Trail, access road from Central Ave along Hancock St
Zip
94501
Total Acres
2.00
Parcel #
74-890-4
State Highways
SR 61
Schools
Encinal HS
Waterways
SF Bay

Notice of Determination

Approving Agency
East Bay Regional Park District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.