South of Palermo Reinforcement Project
11 Documents in Project
Summary
SCH Number
2017042051
Lead Agency
California Public Utilities Commission
(CPUC)
Document Title
South of Palermo Reinforcement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/3/2018
Present Land Use
LU: gen ag, exclusive ag, ag/res, res, light industrial, and gen commercial uses
Document Description
Project involves the replacement of transmission wires and modifying or replacing existing lattice steel structures on the Palermo-Rio Oso transmission system alignment. Including replace the conductor and existing lattice towers on the power line between Palermo Junction and Rio Oso; replace the conductor on the Palermo sub-line; install cage tops on existing towers, replace a single lattice tower, and re-conductor on the Please sub-line; replace existing towers and conductor on the double-circuit lines to Bogue; replace 15 of 45 towers and the conductor on the double-circuit line between East Nicholas and Rio Oso; and undertake minor modifications to equipment and facilities.
Contact Information
Name
Nicholas White
Agency Name
Central Valley Regional Water Quality Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Marysville, Yuba City
Counties
Butte, Sutter, Yuba
Cross Streets
SR 70
Zip
95968,9590
State Highways
70
Township
12N
Range
4E
Section
21
Base
MD
Notice of Determination
Approving Agency
Central Valley Reigonal Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.