South of Palermo Reinforcement Project
11 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017042051
- Lead Agency
- Public Utilities Commission, California (California Public Utilities Commission)
- Document Title
- South of Palermo Reinforcement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/3/2018
- Present Land Use
- LU: gen ag, exclusive ag, ag/res, res, light industrial, and gen commercial uses
- Document Description
- Project involves the replacement of transmission wires and modifying or replacing existing lattice steel structures on the Palermo-Rio Oso transmission system alignment. Including replace the conductor and existing lattice towers on the power line between Palermo Junction and Rio Oso; replace the conductor on the Palermo sub-line; install cage tops on existing towers, replace a single lattice tower, and re-conductor on the Please sub-line; replace existing towers and conductor on the double-circuit lines to Bogue; replace 15 of 45 towers and the conductor on the double-circuit line between East Nicholas and Rio Oso; and undertake minor modifications to equipment and facilities.
- Contact Information
-
Nicholas White
Central Valley Regional Water Quality Control Board
11020 Sun Center Dr., #200
Rancho Cordova, CA 95670
Phone : (916) 464-4856
Location
- Cities
- Marysville Yuba City
- Counties
- Butte Sutter Yuba
- Cross Streets
- SR 70
- Zip
- 95968,9590
- State Highways
- 70
- Township
- 12N
- Range
- 4E
- Section
- 21
- Base
- MD
Notice of Determination
- Approving Agency
- Central Valley Reigonal Water Quality Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- http://www.cpuc.ca.gov/environment/info/dudek/Palmero/index.htm
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.